Use the Production Log on a work order to record what was produced and what was scrapped, so your records reflect actual yield.

Who this is for

Production and ops staff tracking output and waste during a manufacturing run.

Before you begin

  • The work order is In Progress.

Steps

  1. Open the work order and open the Production & Logistics Steps tab.
  2. Click Log Production.
  3. Enter Quantity Produced and Quantity Scrapped, and optional notes.
  4. Save the entry. It is stamped with who logged it and when, building a running record for the job.

What happens next

Scrapped quantities give you a record of waste against produced output. How components deplete when the assembly completes is governed by each component's consumption basis (Planned vs Actual).