Estimated landed cost vs actual landed cost — what's the difference and when does each apply?
Updated
Two numbers, two jobs
Estimated landed cost (ELC) — a planning number stored on the SKU: what you expect a unit to cost all-in. Used before goods arrive — margin planning, valuing incoming stock, filling gaps when actuals don't exist yet.
Actual landed cost — calculated at receiving: PO price plus this receipt's allocated share of real extra costs. This is what your inventory is valued at and what COGS uses (FOB Cost vs. Landed Cost Explained).
Why keep ELCs accurate
Margin and pricing decisions made before receiving use the ELC — a stale ELC quietly misprices your catalog.
A large gap between ELC and actuals is an early-warning signal: your freight/duty assumptions are out of date, or costs are not being entered on shipments.
Review SKUs where actual receipts consistently land above or below the ELC, and update the ELC.
Use the variance threshold setting to control when the system automatically overrides the actual cost with the ELC — if the gap between actual and ELC exceeds the threshold, the ELC is used in place of the cost-layer cost for sales items.